The Press Room
+50
Winter is Coming
Hapless_Hans
futbol
MaraVilla
Beautiful Football
Ganso
Deja Vu
Donuts
Harmonica
Kick
Madvillain
Hamdyman
El Chelsea Fuerte
everest1
eelir
kiranr
windkick
BarcaLearning
matpol
Loshijosdequien
TheRedStag
billionmillion
CBarca
billy_gr
FennecFox7
The Sanchez
H.A.
Sir Psycho
free_cat
Piquenbauer
EliMiNiMi
RealGunner
ausbaz
spanky
nandi7
Albiceleste
messixaviesta
Blackmore.
Prometheus
DV7
sagnik92
BarcaKizz
The Franchise
Mr_Puyol
ChollaVille
cyberman
James0311
BarrileteCosmico
Great Leader Sprucenuce
Khaled
54 posters
Page 16 of 17
Page 16 of 17 • 1 ... 9 ... 15, 16, 17
Re: The Press Room
Twitter bots are something every political entity uses and the Barca president is a political role, so it's not exactly hard to believe. That they would use it to talk up the board and target ex-players, critics, and even Messi and Pique when they stray the line is not exactly hard to believe either.
But we should probably wait for hard evidence to call his head (for this). He should be fired from a purely sport-based evidence perspective though, without bringing in all this extraneous stuff into it.
But we should probably wait for hard evidence to call his head (for this). He should be fired from a purely sport-based evidence perspective though, without bringing in all this extraneous stuff into it.
BarrileteCosmico- Admin
- Posts : 27508
Join date : 2011-06-05
Re: The Press Room
You've got a point. The reason I was very skeptical at first is because I thought it had something to do with the 2021 presidential election.
I thought maybe one of Bart's rival presidential contenders is trying to destabilize his presidency, especially now that he seems to be on a shaky ground.
But maybe I'm reading too much into it. He certainly doesn't need anybody to destabilize him, he has already done enough to not be elected.
I thought maybe one of Bart's rival presidential contenders is trying to destabilize his presidency, especially now that he seems to be on a shaky ground.
But maybe I'm reading too much into it. He certainly doesn't need anybody to destabilize him, he has already done enough to not be elected.
The Demon of Carthage- Fan Favorite
- Club Supported :
Posts : 6398
Join date : 2015-01-25
Re: The Press Room
Bartomeu resign was trending on twitter yesterday
I hope early elections are called, with all my heart
I hope early elections are called, with all my heart
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
And then what? Why are Barca fans so sure that another president is going to do anything of note?
futbol- World Class Contributor
- Club Supported :
Posts : 11239
Join date : 2012-11-23
Re: The Press Room
Bartomeu is Rosell's puppet, he should have been gone long ago, absolute frauds both of themfutbol wrote:And then what? Why are Barca fans so sure that another president is going to do anything of note?
I'm sure that he will not do anything worth of note anymore, that reason enough for a change
and thats why there are elections every few years, because change is needed
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
Do you happen to know if Laporta will run for president? So far, I think only a guy named Víctor Font has publicly announced his intention to run.
The Demon of Carthage- Fan Favorite
- Club Supported :
Posts : 6398
Join date : 2015-01-25
Re: The Press Room
Laporta might run but I don't reckon the chances are high. I'd say 50% from what i've seen in the news
President Bartomeu: "This morning I gave the order to terminate the contract with I3 Ventures after it has been verified that one of the accounts linked to this company has made inappropriate comments to people in our organization."
obviously that *bleep* is behind all of this
the only thing he's doing is destabilizing the team
President Bartomeu: "This morning I gave the order to terminate the contract with I3 Ventures after it has been verified that one of the accounts linked to this company has made inappropriate comments to people in our organization."
obviously that *bleep* is behind all of this
the only thing he's doing is destabilizing the team
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
Montserrat Font, Barça's finance director, has resigned. She will leave on March 1. [espn]
ABC reports Cadena SER has evidence of Barca intentionally working to discredit people connected with the club, gg Bartomeu
Pique just tweeted "Muppet" in reponse to a MD journalist who is a big Bartomeu supporter.
this club is a joke. one crisis on top of another, what a mess
ABC reports Cadena SER has evidence of Barca intentionally working to discredit people connected with the club, gg Bartomeu
Pique just tweeted "Muppet" in reponse to a MD journalist who is a big Bartomeu supporter.
Titella
— Gerard Piqué (@3gerardpique) February 18, 2020
this club is a joke. one crisis on top of another, what a mess
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
I can spot few posters in this board on the same boat. Also barcaforum pretty much got ruined because they allowed these saboteurs to troll.The Demon of Carthage wrote:Guys, are you aware of this?Source: Forbes | Marca
- Spoiler:
A scandalous report in Catalonia has claimed that FC Barcelona contracted the services of I3 Ventures, a social media company, in order to damage the reputations of key figures such as Lionel Messi and Gerard Pique, potential presidential candidates, plus former players and managers.
According to the La Llotja del Què t’hi Jugues podcast and radio programme on SER Catalunya, the focus of a controversial operation has been to “create opinions on social media”, “with two main objectives”.
The first is to “protect the reputation of President Josep Maria Bartomeu and his board” and the second, “to erode the image of people and entities that have relations with the club to a different degree”.
When you read the report, you immediately feel it's BS. But Barça has officially released a statement to deny everything, which prompts me to believe there might be some truth to it.
What do you guys think?
Harmonica- World Class Contributor
- Club Supported :
Posts : 13507
Join date : 2011-06-07
Re: The Press Room
Vice Presidents Emili Rousaud and Jordi Cardoner have asked Barça executives to force a resignation from Bartomeu. [cat radio]
Certain sections of the Barça board are demanding a resignation from Bartomeu and for elections this summer. [cat radio]
Certain sections of the Barça board are demanding a resignation from Bartomeu and for elections this summer. [cat radio]
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
6 board members have resigned in a joint letter calling for elections in summer 2020

Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
About time. Let's hope it happens
BarrileteCosmico- Admin
- Club Supported :
Posts : 27508
Join date : 2011-06-05
Age : 31
Re: The Press Room
Three more members are considering to resign. Soon Bartomeu will be left on his own lol
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
If this happens, Messi is the best leader ever, not just in football, but in any sport.
Harmonica- World Class Contributor
- Club Supported :
Posts : 13507
Join date : 2011-06-07
Re: The Press Room
FC Barcelona wrote:FC Barcelona hands over Camp Nou title rights to the Foundation to raise money for the fight against Covid-19
The Club cede rights to the Barça Foundation who will search for a stadium sponsor for next season
https://www.fcbarcelona.com/en/club/news/1658662/fc-barcelona-hands-over-camp-nou-title-rights-to-the-foundation-to-raise-money-for-the-fight-against-covid-19
Say hello to a new era. This is just the beginning. They are using a temporary excuse for a permanent goal (much like the whole Unicef shenanigans).
Re: The Press Room
UNICEF was Laporta and the rest was Rosell/Bart, hard to say that it was part of the same grand plan
Still this will probably become permanent, I agree.
Still this will probably become permanent, I agree.
BarrileteCosmico- Admin
- Club Supported :
Posts : 27508
Join date : 2011-06-05
Age : 31
Re: The Press Room
I hope its not some oriental BS like rakuten, xhanghai pudong, beko or qatar or someshit
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
[Fernando Polo and Shay Lugassi] Barcelona are set to close two shirt sponsorship deals. Spotify will be the main sponsor with a 5 year deal of 340 million. Polkadot will be the sleeve sponsor and pay 100 million for 5 years. The total figure of 85 million per year is the highest in world football.
Winter is Coming- First Team
- Club Supported :
Posts : 4430
Join date : 2013-05-08
Re: The Press Room
I dont think i've bought a single kit in the past 10 years. They've all been horrible, mostly thanks to Nike's poor designers I guess. But having Qatar or Rakuten on the front also didnt help.
Spotify could possibly look decent on the kit, however the new rumored design is also shit. They should switch to adidas
why do the stripes cut off early? It looks better than this year's shite, but could still be better

Spotify could possibly look decent on the kit, however the new rumored design is also shit. They should switch to adidas
why do the stripes cut off early? It looks better than this year's shite, but could still be better

These Barcelona mockup kits are
— ESPN FC (@ESPNFC) January 27, 2022
(via @PrimeDesignss, @ikrodesign) pic.twitter.com/1nrK9Lbjos
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
If Spotify is the sponsor they better not insist on a green logo
BarrileteCosmico- Admin
- Club Supported :
Posts : 27508
Join date : 2011-06-05
Age : 31
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
Pretty good deal considering our current lack of star power
BarrileteCosmico- Admin
- Club Supported :
Posts : 27508
Join date : 2011-06-05
Age : 31
Re: The Press Room
definitely getting the home kit this year, best one in years as much as i dislike nike


Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Re: The Press Room
That looks bomb.
Lucifer- The Last Cat Hater.
- Club Supported :
Posts : 8292
Join date : 2015-06-16
Age : 31
Re: The Press Room
Official: Barça will play the 2023-2024 season at the Olympic Stadium in Montjuïc. [fcb]
Official: Agreement has been reached for the Espai Barça project and the work will commence in June. [fcb]
Official: Agreement has been reached for the Espai Barça project and the work will commence in June. [fcb]
Laporta: "The new Camp Nou will be the best stadium in the world, in the best city in the world and in the best country in the world." pic.twitter.com/7m4YDeWDrJ
— barcacentre (@barcacentre) April 28, 2022
Myesyats- World Class Contributor
- Club Supported :
Posts : 16442
Join date : 2015-05-03
Age : 23
Page 16 of 17 • 1 ... 9 ... 15, 16, 17

» - The Press Room -
» The Official WWE Thread
» The Music Room
» Revisiting the dark room
» The Music Room
» The Official WWE Thread
» The Music Room
» Revisiting the dark room
» The Music Room
Page 16 of 17
Permissions in this forum:
You cannot reply to topics in this forum
|
|
» The new king of football - Kylian Mbappe
» Mikel Arteta Sack Watch
» AC Milan Campione d'Italia 21/22 Official Thread
» Speculative thread for 2022/23 squad
» The Official LaLiga Thread
» 2021/2022 Premier League Discussion
» Juventus summer 2020 special - now summer 2021
» Calcio Saga 21/22
» Women's General Football Discussion
» Conte Spurs Sack Watch
» Pep Guardiola - King of the Carabao Club
» Balotelli Watch - OGC Nice